Kinda Development Company is concerned with the most important steps in establishing plumbing, as plumbing is one of the basics in any home or institution. If one uses a distinguished company such as Kinda Company, which is capable of carrying out all the plumbing work from foundation to final decoration in plumbing and drainage, as the company works through a plan followed by engineers.
The company’s consultants are highly experienced and skilled, and it works by using the best materials and equipment. Through this article, we will learn about all the steps that the company takes to obtain a high-quality plumbing establishment.
The most important steps in establishing plumbing followed by Kinda Development
Kinda Development Company is interested in adhering to all the steps and arrangements specified by the company’s specialized engineers to carry out the most important steps in establishing plumbing, whether at home, in a villa, in hotels, or in commercial establishments and offices. Among the most important steps that the company follows are the following:
- Kinda Development is interested in following the design plan for toilets, kitchens, and all plumbing facilities, including laundry rooms and sewage networks.
- The company uses different types of plumbing methods, as the company has the ability to suspend and bury the facilities and make them visible and hidden on the walls.
- After confirming the construction of the sewage pipes, the company’s specialized technician begins planting 6-inch outlets from the sewage drainage pipes during the foundation, and the pipes are 6 meters high and 7 mm thick.
- The technician implants a 2-inch tube into which feeding tubes are later passed.
- After emptying the sewage, the water is connected to the central main drain, and the sewage pipes consist of 6 inches and are placed 4 meters apart from each other.
The most important steps in establishing plumbing (bone stage)
- When facing any of the difficult problems or challenges during the plumbing installation, the highest quality trained technician should automatically deal with the problem or go to the supervising engineer and guide him to an ideal solution. For example, when there is a 90-degree bend, a 90-degree elbow is not used, but a Y-square with an elbow is used. At an angle of 45 degrees, slopes are treated every meter, and the thickness of the pipe is 7 mm.
- The engineer is interested in verifying the completed foundation, especially after the water has arrived. He works to confirm the inclination and test the flow of water by blocking the last points to see the direction of the water when draining, to ensure that water does not leak because the drainage pipes are buried between soft sand.
- The foundation phase ends after the drainage pipes are laid and the sewers are buried.
- If the toilet is suspended and the plumbing is not suspended, outlets in the landing such as a wind elbow are placed inside the 6-inch thick mold.
- The technician finishes the bones i.e. the branch supplies of the sewer pipes to connect to all the sinks and drains.
The most important steps in establishing plumbing (establishment stage)
- The foundation stage begins immediately after the orthopedic stage is completed. If the bathroom contains a bathroom with an Arabic chair and a French chair, an outlet for water drainage is placed between them.
- The distance between the bathroom chair and the wall is determined by the company’s specialized engineer, as 30 cm is specified between the wall and the bathroom chair, and the French chair is placed with a wind attachment at a 90 degree angle.
- Then the stage of establishing the feeding pipes begins with a size of ¾ and the main valve is 1 inch. The location of the shower is determined, and it is often on the right side of the bathroom chair, and the height of the shower is one meter above the ground.
- The drains’ feed pipes are supplied at a height of 40 cm, and the heaters are placed two meters from the ground and fed by the feed pipes.
- Cold and hot mixers are separated from each other in a separate stream.
- Once the feeding is complete, the technician begins by creating 2-inch thick drain pipes that connect to the main drain inside the toilet.
- A dedicated drain line is created for the kitchen, using 4-inch main drain pipes with a windshield attachment to create a drain for the laundry, sink, and dishwasher that are connected to the kitchen main line.
- A 2-inch feeding network is connected from the upper tank, a main valve is placed, and a separate line is branched for each toilet with a thickness of 1 inch and the kitchen with a thickness of 1 inch as well.
The most important methods used in the steps of establishing plumbing
Kinda Development Company is interested in following standard methods for establishing plumbing, through the most skilled technicians who have many extensive experiences in the field to face various difficulties and challenges, and the most important of these methods are:
- You must choose the best types of durable pipes that are not subject to any corrosion or rust.
- You must ensure optimal waterproofing to protect your home from water leakage.
- Specific locations for the washing machine and dishwasher must be designated, whether in the bathroom or kitchen, so that water does not leak.
- To preserve your home, you must ensure all steps for establishing the home, so you must cooperate with an approved company that understands all the risks and challenges that you may face in the work of establishing plumbing.
Waterproofing is one of the most important steps in establishing plumbing
You must ensure that the company specialized in plumbing work performs waterproofing, as it is one of the most important steps in establishing plumbing, as waterproofing works to protect the place from water leakage through:
- Protecting sewer pipes and walls from cracking and cracking.
- Protects pipes from corrosion and damage.
- Protects the floor from cracks, moisture and building construction.
- Waterproofing requires engineers specialized in installation and plumbing installation, and their advice and expertise can be obtained through Kenda Company, which specializes in plumbing installation through engineers and technicians who have many experiences and skills.
Waterproofing tools
Kenda technicians use many different tools and equipment that help in establishing plumbing and waterproofing, including the following:
- Be lightweight.
- Resistant to rust and damage.
- Resists water leakage.
- Protection for kitchens and bathrooms from water and the entire building as well.
- Used in the foundation of bathrooms to insulate bathrooms.
Proper height plumbing pipes
It is preferable to follow Egyptian standards in selecting pipes and their height when establishing plumbing, and these heights include:
- The appropriate bathroom sink height above the finishing level is 80 cm.
- The height of the bathtub mixer must be 20 cm higher than the bathtub.
- The height that must be followed in the bathtub feed pipes above the finishing level is 65 cm
- The height of the feed and drain pipes of the basin above the finishing level is 50 cm.
- The height of the flush toilet feed above the finishing level is 25 to 30 cm.
- The toilet drain pipe at the bottom must be 8cm higher than the finishing level.
- The distance between the hot water mixer pipe and the cold water should be 15 cm.
- A distance of 15 cm is required between the hot water pipe and the cold water pipe.
Read more: Installing marble with white cement
Consequences of incorrectly installed plumbing
When any of the mistakes occur in the steps of establishing plumbing, it is considered a serious mistake that will lead to major mistakes in the future. Therefore, a company specialized in establishing plumbing must be used to avoid any plumbing damage, such as:
- When the damage caused by the foundation error increases, which may lead to the demolition and damage of the entire building.
- It may lead to damage to the floors in bathrooms and kitchens and cracking due to water leakage and humidity.
- When repairing and restoring any damage to the plumbing foundation, the company may resort to demolishing part of the concrete structure of the building.
Thus, we have concluded this article presented by Kinda Development Company, which presents the most important steps for establishing plumbing to meet all customer needs.